top of page

Project - CCGT 463 MW

Purchaser:  

  • SNC-Lavalin Polska

  • Orlen

​

Site Construction:  

  • WÅ‚ocÅ‚awek, Poland

​

​

Realization:

  • 09.2014 - 02.2016

​

​

Subject:

  • Assembly of a 460 MW steam-gas turbine, which includes a gas turbine with an air intake, a steam turbine with a condenser and a generator. Installation of high-pressure and high-temperature pipelines between the boiler and the steam turbine

© 2023 by Sphere Construction. Proudly created with Wix.com

  • Facebook
  • Linkedin
bottom of page