top of page
Project - CCGT 463 MW
Purchaser:
-
SNC-Lavalin Polska
-
Orlen
​
Site Construction:
-
Włocławek, Poland
​
​
Realization:
-
09.2014 - 02.2016
​
​
Subject:
-
Assembly of a 460 MW steam-gas turbine, which includes a gas turbine with an air intake, a steam turbine with a condenser and a generator. Installation of high-pressure and high-temperature pipelines between the boiler and the steam turbine
bottom of page